BUILDING & PUBLIC WORKS

  1. Painting work on the anti-water hammer piping and hydraulic equipment of the HAMMA valve chamber
  2. SECURITY AND UPGRADE WORKS AT THE NEW MAHALMA PUMPING STATION
  3. Construction of four 5m x 5m reinforced concrete borehole shelters, 4.5m high
  4. Construction of a 1300 mยฒ reinforced concrete platform for the rehabilitation of the tunnel slabs at the KABLE station
  5. Construction and renovation work on the valve chambers of the SPIK network (Tafourah to the Grand Mosque of Mohammedia)
  6. Construction and installation of three reinforced concrete bases for the new GEPHs at the HYDRA station
  7. Construction and installation of two reinforced concrete bases for the new GEPHs at station 158
  8. Construction and upgrade of three valve chambers at the BMR center and distribution management, PK25 SPIK manhole
  9. Construction of a transformer substation shelter + supply and installation of Electrical equipment in Ouled Mendil, Birtouta Municipality.
  10. Construction of a transformer substation shelter + supply and installation of electrical equipment in Sidi Mhamed New Town, Birtouta Municipality.
  11. Completion of waterproofing repairs, access hatches, caged ladders, and painting of pumping station tanks (Ouled Mendil, Rais, Ouled Belhadj)
  12. Construction of three chlorination shelters at the following sites: F Ali Bouhadja Bis, F Tayeb Djoughlali, and F Baba Ali Douar
  13. Construction of a reinforced concrete retaining wall and perimeter fence at the Rostomia pumping station
  14. Construction of a reinforced concrete retaining wall and perimeter fence at Dely Ibrahim
  15. Construction and installation of four reinforced concrete bases for the new GEPH (Gas and Hydroelectric Power Plant) at the Garidi pumping station
  16. Construction of a reinforced concrete retaining wall and perimeter fence at Bouzareah
  17. Raising of the perimeter wall and painting of two tanks at pumping station 158
  18. Civil engineering work for the Putavy Birkhadem borehole development project
  19. Rehabilitation work Waterproofing – DP SP GARIDI Office
  20. Rehabilitation work on the equipment of the anti-water tank at the Douaouda repair chamber, Kolea Center
  21. Repair of the DN350 pipeline trench at the Bir Mourad Rais (BMR) site
24322011 10213967668807093 897146866 o 1 e1518196988932 1024x765
20210623 115953 1024x472
site 1870105 1920 e1519338871395 1024x865
sans titre6
sans titre3
sans titre2
large construction e1518194834305
img 20220912 wa0002
building construction e1520029599678
alliedguard security construction gallery 2
20220117 110256 472x1024
20150630 143832 1024x576
20150630 143746 1024x576
0842943f49fe e1518211585630 1024x769
20210712 133250 472x1024
20210816 102152 472x1024
20210830 104622 1024x472
20210623 115953 1024x472
travaux public
sans titre4 e1515189425412
travaux public 1024x726
john kakuk hvvpcehylog unsplash
20210623 111241
construction site 2468072 1920 e1519422245671 1024x872
20181128 170434
20210623 111241
travaux public
20220814 140726
20221109 112111
20221227 112327
20231003 152643
20231003 161200
20190311 120148
20181015 135832